This job is no longer available
This job expired on 12/08/2026. It no longer accepts applications.
Electrical Site Manager – Data Centre Construction
Sustainable Talent LTD · Francfort-sur-le-Main
Job description
About the role
We are seeking an Electrical Site Manager to join a major EU data‑centre programme based in Frankfurt. The role carries full responsibility for the electrical scope on‑site, coordinating subcontractors, managing programme and quality, and ensuring safe, on‑time delivery.
Key responsibilities
- Manage all electrical works on site, from containment and cabling through to switchgear, UPS and final connections.
- Coordinate and supervise electrical subcontractors and direct labour.
- Ensure compliance with project specifications, drawings and European standards.
- Drive site health and safety, including RAMS reviews, permits and toolbox talks.
- Monitor programme progress and quality, identifying and resolving issues proactively.
- Interface with commissioning teams during testing and energisation phases.
- Support inspections, snagging and final hand‑over documentation.
Required profile
- Proven experience as a Site Manager or Electrical Site Manager on data‑centre or mission‑critical projects.
- Strong electrical background (trade or engineering) with solid understanding of HV/LV systems, UPS, generators and critical power infrastructure.
- Experience working on EU‑based construction projects.
- Excellent coordination and stakeholder‑management abilities.
- Strong health and safety awareness and leadership on site.
- Fluent English; German advantageous but not essential.
- Right to work in the EU or ability to work in Germany on a contract basis.
Required skills
- HV/LV power systems
- Uninterruptible Power Supplies (UPS)
- Generators
- Switchgear
- Cabling and containment systems
- Compliance with European electrical standards
What we offer
- 12‑month contract on a high‑profile data‑centre project.
- Competitive day rate (DOE).
- Potential extension or future EU projects.
- Immediate involvement in a fast‑paced, technically challenging build.
Questions fréquentes
Why are you reporting this job?
Explore further
Salaries, guides and searches in Germany.
Salaries by job title
- Financial Controller (m/w/d) 11
- Controller (m/w/d) 8
- Business Development Manager 7
- Baustellenleiter (w/m/d) für Hochspannungsschaltanlagen 7
- Front Office Agent (m/w/d) 7
- Junior Mobile Developer (Android/iOS) – Frankfurt 7
- Assistenzarzt (m/w/d) in Weiterbildung – Allgemeinmedizin 7
- Key Account Manager (m/w/d) 7
Boost your chances
Upload your CV — we will match you with relevant openings.
Analyzing your CV...
Sustainable Talent LTD
Francfort-sur-le-Main
Related job offers
-
German‑Speaking Procurement Officer
John Paul Construction Francfort-sur-le-Main -
Bauingenieur*in Geotechnik (Brückendesign)
Arup Francfort-sur-le-Main -
Project Manager – Fit‑out & MEP Projects (Ireland/Europe)
GEDON™ | Precision Search for Complex Construction Francfort-sur-le-Main -
Technischer Außendienst für Photovoltaik & Energiesysteme
1komma5grad Riederich -
Technische Planung (m/w/d) Wärmepumpen & Heiztechnik in Voll- oder Teilzeit
1komma5grad München